Innovation in Research Excellence in Management & Development Work
   EN   MK

HR-ZAGREB: IPA — PREPARATION OF DESIGN AND OTHER PROJECT DOCUMENTS FOR 'UPGRADE, RENEWAL, CONSTRUCTION OF SECOND TRACK AND CONSTRUCTION OF NEW DOUBLE TRACK LINE ON SECTIONS OF R...

Skip Navigation LinksHome - Item
Deadline: 28-09-2012 Location: Croatia Back


Contract description                                                                         Maximum budget: EUR 16 350.000

This service contract consists of 2 phases: 2 and 3. Phase 2 includes preparation of design and obtaining necessary permits for upgrade, reconstruction and  renewal of the existing single track railway line on subsections Novoselec–Kutina (26 km) and Kutina–Novska  (25,5 km), on railway line M103 Dugo Selo–Novska in Croatia. Activities include: main design for works on  infrastructure, energy, and control, command and signalling subsystems including obtaining building permits;  geotechnical study; draft tender dossiers.  Phase 3 includes preparation of design and obtaining necessary permits for construction of second track  on subsections Dugo Selo–Novoselec (32 km), Novoselec–Kutina (29 km) and Lipovljani–Novska (11 km),  construction of new double track railway line on subsection Kutina–Lipovljani (10 km), on railway line M103  Dugo Selo–Novska. Activities include: preliminary design including obtaining location permit; feasibility study  including cost-benefit, financial and economic analysis; EIA study including development consent granted;  draft project application; main design for works on infrastructure, energy, and control, command and signalling  subsystems including obtaining building permits; geotechnical study; draft tender dossiers.

Budget

Maximum budget: 16 350 000 EUR.

Eligibility

Participation is open to all legal persons (participating either individually or in a grouping (consortium) of  candidates) which are established in a Member State of the European Union or in a country or territory of the  regions covered and/or authorised by the specific instruments applicable to the programme under which the  contract is financed (see also item 29 below). Participation is also open to international organisations. The  participation of natural persons is governed by the specific instruments applicable to the programme under  which the contract is financed.

Deadline: 28 September 2012

For more info clcik here



Back