EURONET CONSULTING EEIG/ FEASIBILITY STUDY EXPERT
Deadline: 04-02-2014
Location: Montenegro
Back
Descritpion
The general objective of the project is to repair the main railway line Vrbnica - Bar through the rehabilitation of critical parts of line (rehabilitation of slopes and construction of galleries or other protective structures).
Requirements
- At least Master Degree Academic level or equivalent University degree (where a university degree has been awarded on completion of a
study in a university or equivalent institution) in engineering, economy or other relevant educational background;
- Fluency in English language, both spoken and written.
- At least 6 years of professional experience in the sector(s) directly or indirectly related to the Lot 2
- At least two (2) projects of a similar size and nature (min. 20 working days performed per project) within the previous 3 years period.
Responsibilities
The main activities will be the slopes stabilization and securing the railway line from landfalls, avalanches and landslides. Expected results are: ground stabilization, increased traffic safety and higher train speeds. Through the implementation of the project it is expected to prepare
measures with aim to decrease the number of interruptions in the rail traffic due to landslides, increase the level of traffic safety and smooth traffic flow in accordance with the planned timetable.
Deadline: 04 February 2014
For more information click here
Back