Contract description
The purpose of this contract is to provide supervision services for reconstruction of the non-electrified single –track railway section Bitola-Kremenica of a length of app. 17 km, as part of Xd of Corridor X in accordance with FIDIC “Conditions of Contract for Building and Engineering Works Designed by the Employer”, First Edition 1999 –FIDIC “Red Book”. The Consultant shall ensure that services for supervision shall be in accordance with all the requirements for quality control, control of quantities, supervision of the work progress, analyses of expenses, implementation of the environmental criteria as well as working on administrative questions during the rehabilitation works and defect liability period.
The works on this section of the railway line include the following main activities: renewal of app. 17 km (from km 129.310 to km 146.190) of the permanent way with increasing the bearing capacity; construction of one station at Zabeni and reconstruction one halt at Kravari including track alignment (sidings); 10 level crossings in this section will be converted into secured level crossings; 6 existing bridges to be demolished and constructed anew; 3 existing bridges to be demolished and replaced with culverts; belonging signalling and telecommunication and ERTMS (level 1).
Budget
Maximum budget: 1 million EUR
Eligibility
Participation is open to all legal persons [participating either individually or in a grouping (consortium) of candidates] which are established in a Member State of the European Union or in a country or territoryof the regions covered and/or authorised by the specific instruments applicable to the programme under which the contract is financed. Participation is also open to international organisations. The participation of natural persons is governed by the specific instruments applicable to the programme under which the contract is financed.
Deadline: 07 April 2014