EUROPEAID/135472/DH/SER/BA: IPA - PREPARATION OF PRELIMINARY STUDIES AND DESIGNS FOR IMPROVEMENT OF THE ROAD ON THE SEETO ROUTE 2A: LAŠVA - JAJCE – UGAR (INTER ENTITY BOUNDARY LIN...
Deadline: 20-11-2014
Location: Bosnia and Herzegovina
Back
Description
The assignment aims to facilitate access to the loan funds of IFIs for construction of the respective road section, the present bottleneck on the SEETO Comprehensive Network Route 2a. The assignment shall consist of two separate components, concerning:
- Component 1: main roads M5 and M1: Lašva - Jajce - Ugar - IEBL.
- Component 2: main roads M5 and M16: IEBL - Ugar - Banja Luka - Banja Luka By-pass.
The Project shall provide for:
- Conceptual designs and preliminary studies for the betterment / reconstruction / construction of road sections,
- Technical documentation required for the tender procedure for provision of the Preliminary and the Main Design.
Eligibility
Participation is open to all legal persons [participating either individually or in a grouping (consortium) of candidates] which are established in a Member State of the European Union or in a country or territory of the regions covered and/or authorised by the specific instruments applicable to the programme under which the contract is financed. Participation is also open to international organisations. The participation of natural persons is governed by the specific instruments applicable to the programme under which the contract is financed.]
Budget
Maximum budget 1,000,000 EUR
Deadline: 20 November 2014
For more information click here
Back