RS-BELGRADE: IPA — MODERNISATION OF RAILWAYS — PROJECT DOCUMENTATION FOR THE RAILWAY LINE NOVI SAD–SUBOTICA–HUNGARIAN BORDER 2012/S 60-096517
Deadline: 03-05-2012
Location: Serbia
Back
Contract description: Maximum budget: EUR 6.800.000
The project purpose is the preparation of the technical documentation for the rail modernization project 'Doubling and upgrading of existing railway corridor Xb, section Novi Sad (excluding the junction)–Subotica– Hungarian border', prepared in accordance with EUinteroperability standards, AGC, AGTC and the SEECP Agreement. The assignment includes the following services:
a. preliminary surveys including geotechnical investigations and geodetic surveys;
b. the preparation of the feasibility study including cost-benefit analysis and environmental impact assessment study;
c. the preliminary design for construction, modernisation and doubling of railway civil infrastructures and technological components,
including ERTMS introduction, BoQ and cost estimates;
d. the preparation of the tender dossier for a 'design and build' works contract (in accordance with EU PRAG requirements and FIDIC
conditions);
e. the preparation of project financing applications (application forms, following DG REGIO's requirements and IFIs' requirements) in an
EU Member State, EU candidate or potential candidate countries for transport investment projects.
The project should result in the set of documentation prepared in compliance with the national regulations and EC requirements, ready to be approved by the national reference institutions as well as EC relevant authorities.
Budget:
Maximum budget: 6 800 000 EUR.
Eligibility:
Participation is open to all legal persons (participating either individually or in a grouping (consortium) of candidates) which are established in a Member State of the European Union or in a country or territory of the regions covered and/or authorised by the specific instruments applicable to the programme under which the contract is financed. Participation is also open to international organisations. The participation of natural persons is governed by the specific instruments applicable to the programme under which the contract is financed.
Deadline: 3 May 2012
For more info click here
Back